    Teplárna Brno

    Implementation date

    1999

    Field

    Gas

    Situation description

    The Cerveny mlyn heating plant in Brno has been in operation since 1999, producing heat in the so-called steam-gas cycle. We delivered a gas regulation station for this heating plant, which is crucial for reliable heat supply. The source from this heating plant is the main interconnection node for hot water feeders in the localities Brno – Lesna and Brno Kralovo Pole – Zabovresky.

    Parameters

    Qmax = 25 000 m3(N)/hour
    Inlet pressure: 34 bar
    Outlet pressure: 24 bar – RS for SIEMENS combustion turbine
    Electrical power: 80 MW
    Thermal power: 240 MW
    Installation with FRANZEL MPS controllers (for the boiler room) a FISHER EZR + EZR OS (for the turbine)