Brno heating plant regulation station – HUTIRA
Client
Teplárna Brno
Implementation date
1999
Field
Gas
Situation description
The Cerveny mlyn heating plant in Brno has been in operation since 1999, producing heat in the so-called steam-gas cycle. We delivered a gas regulation station for this heating plant, which is crucial for reliable heat supply. The source from this heating plant is the main interconnection node for hot water feeders in the localities Brno – Lesna and Brno Kralovo Pole – Zabovresky.
Parameters
Qmax = 25 000 m3(N)/hour
Inlet pressure: 34 bar
Outlet pressure: 24 bar – RS for SIEMENS combustion turbine
Electrical power: 80 MW
Thermal power: 240 MW
Installation with FRANZEL MPS controllers (for the boiler room) a FISHER EZR + EZR OS (for the turbine)